11.2 [Work in Progress] Thesis 2: Major Project / Thesis Materials

I was sick with acute bronchitis. Which honestly I could not really do anything this week which pushed a lot behind. Next module will have to be pushed forward in a major way.

Previous
Previous

12.2 [Preliminary Work] Thesis 2: Major Project / Thesis Materials

Next
Next

10.2 [Work in Progress] Thesis 2: Major Project / Thesis Materials